Lakeview Collection System - Phase 5
Project Name:
Area 701- Stage 3, Lakeview Phase 5 Sanitary Sewer Project (Montigny)
Project Site Plan:
Project Boundary Map
Related Projects:
Casa Loma/Lakeview Sewer Servicing Strategy
File Number: 5340-70-701
Start Date: Spring / Summer 2006
Sub. Comp. Date : November 2006
Number of Units:
- 177 Residential Units
- 2 Agricultural parcels
Project Cost (estimated):
$1,935,000
Unit Cost: $7,700 per residential equivalency
Costs to Connect:
- Sewer Application Fee: $100
- Building Permit Fee: $150 ($50 is refunded once connection is approved)
- All on-site costs to connect the existing residence to the service connection at
the property line are the responsibility of the owner.
Description:
- Fourth of seven construction projects, which will provide sewer to the Lakeview
Heights area (Link
to Presentation pdf from Public meeting)
- The area identified as Phase 2 (Thacker Road South) in the initial Sewer Servicing
Strategy has been combined with Phase 5 (Montigny Road) to form the boundary for
this construction project.
- Construction of sewer collection system including manholes, mains and services to
property line
Current Status:
- The construction contract was awarded by the Regional Board to R355 Enterprises
Ltd., on April 25, 2006.
- Construction underway as of May 15, 2006.
Consultant: CTQ Consultants Ltd., Matt Cameron, P. Eng.,
Phone: (250) - 979-1221 Fax: (250) - 979-1232
Contractor: R355 Enterprises Ltd., Phone: (250)-765-9860,
Fax: (250)-765-6091
RDCO Contact: Engineering Services, Phone: (250) 469-6241
Fax: (250) 762-7011 Email: engineer@cord.bc.ca
|